Skip to content

Projects

Works across state road, local government and civil infrastructure

A selection of CII operations, filterable by capability, state and sector. Detailed project references, including client names and contract details, are provided with tender submissions.

Showing 12 of 12 works

CII night works under lighting towers with paving plant on a sealed carriageway

NSW / State road network

Night asphalt overlay under traffic

Asphalt overlay placed under lighting towers with staged traffic control, allowing the carriageway to be returned to traffic before the morning peak.

Environment
Night works
View Asphalt Placement capability
Multiple items of CII plant working across a full-width road construction operation

NSW / Civil infrastructure

Full-width carriageway surfacing

Multiple items of plant working across the full pavement width, with tipper haulage feeding the paver continuously to maintain mat temperature.

Environment
Full carriageway closure
View Asphalt Placement capability
Freshly placed asphalt overlay being compacted by a CII roller on a regional road

NSW / Local government

Regional road asphalt overlay

Programmed overlay on a regional council road, compacted to specification and handed back with documented placement and compaction records.

Environment
Rural road, live traffic
View Asphalt Placement capability
Completed regional road surface delivered by Civil Independence Industries

QLD / Local government

Completed regional carriageway

Completed surface on a regional carriageway, showing finished line, level and edge condition on handover.

Environment
Rural road
View Asphalt Placement capability
CII bitumen spray seal truck applying binder to a prepared pavement

QLD / Local government

Bitumen spray seal application

Binder applied by calibrated sprayer to a prepared pavement as part of a programmed reseal, with application rates recorded against the design.

Environment
Rural road network
View Spray Sealing capability
Aggregate spreader following the sprayer during a CII spray seal application

NSW / Local government

Aggregate spreading during reseal

Aggregate spreader following the sprayer, with rolling immediately behind to achieve embedment before the binder cools.

Environment
Rural road network
View Spray Sealing capability
CII road profiler removing existing asphalt pavement ahead of resurfacing

NSW / State road network

Pavement profiling ahead of resurfacing

Existing asphalt removed to design depth ahead of the surfacing crew, with profiled material carted from site under the environmental management plan.

Environment
Staged lane closure
View Road Profiling capability
Profiled pavement surface prepared by CII ahead of an asphalt overlay

NSW / Civil infrastructure

Profiled surface prepared for overlay

Profiled pavement checked for depth and level before the asphalt overlay is placed, with clean edges cut around existing infrastructure.

Environment
Staged works
View Road Profiling capability
The Civil Independence Industries 140 tonne-per-hour batch asphalt plant at Parkes, New South Wales

NSW / Civil infrastructure

Asphalt production at Parkes

Hotmix produced at the CII Parkes batch plant, supplying CII crews and external council and contractor works across the Central West.

Environment
Fixed plant
View Asphalt Manufacture capability
The Parkes asphalt plant and depot yard operated by Civil Independence Industries

NSW / Civil infrastructure

Parkes plant and depot

The Parkes asphalt plant and depot yard, including binder storage supporting both asphalt production and spray seal operations.

Environment
Fixed plant
View Asphalt Manufacture capability
CII crack sealing unit treating pavement cracks to prevent water ingress

QLD / Local government

Programmed crack sealing

Preventative crack sealing applied across a council network to reduce water ingress and defer more expensive pavement rehabilitation.

Environment
Live traffic, short-duration closures
View Crack Sealing capability
CII crew in high-visibility PPE working alongside plant on an active road site

QLD / Local government

Surfacing crew operations

CII crew working alongside plant under traffic control, with high-visibility PPE and exclusion zones maintained throughout the operation.

Environment
Live traffic
View Asphalt Placement capability

Talk to us for your next road construction project